Menu
C+A
Search
 
 
 

Our Lady & St. John Vocational Centre

This new 300-place Vocational Centre will provide students with the necessary skills to take out into the work place after completion of their studies.

The flexibility of the design allows the changing Educational Philosophy of the school to be catered for over time with the external Architectural form, together with the design of the internal spaces inspiring pupils, staff and forming a focal point for the wider community.

The design of the building evolved from the context and levels of the existing site, with the initial massing and design of a curved building following the flow of the land.

Go Back

  • Location: Blackburn
  • Client: School Governors
  • Type: New Build
  • Value: £5.2m
  • Status: Completed

Gallery

Sign up to our newsletter

More Work